Setup and installation for Thermo Scientific HyPerforma Bioreactor (2/3)

10:29

This video is part 2 of 3 videos that covers the HyPerforma 5:1 Single-Use Bioreactor (S.U.B.) setup and installation. It is based on the HyPerforma 5:1 S.U.B. User’s Guide. In this video, we will cover the initial BioProcess Container (BPC) loading, drive shaft insertion, final installation steps, and safety instructions. After watching this video, be sure to refence the HyPerforma 5:1 S.U.B. User’s Guide for detailed instructions.

View More
View Less

Share this video

Embed